Transport management, warehouse management, terminal control and the human factor at the gate: these four stations decide how far someone gets who wants to see the flow of goods from the inside.
Routes, freight and orders in one place, with interfaces to customers, customs and subcontractors.
Goods receipt, picking, inventory. Grown over years, tightly linked to handheld scanners and mobile devices.
Cranes, slot booking and container logistics run on dedicated systems that conventional IT security concepts rarely give much thought to.
Dozens of unfamiliar drivers and delivery services every day, plus gate staff who are used to exactly this traffic.
Most underestimatedTenant separation and permissions in TMS and WMS, the segmentation between office IT and terminal control, the partner interfaces, and whether access at the gate holds up against a supposed driver.
Cutting across all four stations are the partner interfaces: APIs and portals for shipment tracking, EDI connections and freight booking wire your network straight into your partners'.
Simulated access to gates, warehouses and terminal areas. Beforehand we settle who on site is in the know and how gate staff are brought in afterwards.
Phishing and pretexting, tailored to dispatch, driver communication and the visitor traffic at the gate.
Network segmentation between office IT, TMS/WMS and terminal control, plus access rights and the hardening of the partner interfaces.
Air, rail and water transport including ports are listed in Annex 1 BSIG, postal and courier services in Annex 2. Whether you are in scope depends on your size and your classification as an important or particularly important entity. Larger hubs such as ports can additionally fall under the KRITIS regulation once they cross certain thresholds, which brings its own proof obligations under BSIG. Both sets of obligations can apply in parallel.
From us you get the penetration test and the technical evidence: a report with a severity for each finding, remediation guidance, a management summary and mapping to the NIS2 and KRITIS requirements. The legal classification of your company, registration with the BSI and any form of certification are not part of it.
Three incidents at logistics companies, as described in public reporting.
The logistics service provider based in Osnabrück became the target of a ransomware attack.
A cyberattack on the company affected roughly 1,600 business customers.
In October 2025 the group “CoinbaseCartel” listed the freight giant as a victim on its leak site. DSV did not confirm an attack.
Based on public reporting. Access Granted was not involved in these incidents.
Together we define which systems are tested actively and which are only analysed passively, and which pretexts come into question for the gate and dispatch.
Reconnaissance using public sources, network scans, and after that manual testing according to the agreed scope, with an emergency contact and an immediate stop.
Every finding rated by severity, exploitability and impact on delivery capability and terminal operations, plus a management summary and mapping to NIS2 and KRITIS requirements.
Depending on scope, test execution typically takes one to three weeks, followed by analysis and reporting.
Not automatically: in transport, Annex 1 BSIG lists air, rail and water transport including ports, Annex 2 lists postal and courier services. A pure road haulier is not a listed entity type. Whether you are specifically in scope depends on size and classification. Larger hubs can additionally fall under the KRITIS regulation.
Yes. Small and mid-sized forwarders are often connected to larger supply chains through EDI interfaces and subcontractor relationships, which makes them a detour to a bigger target. ENISA's finding on the transport sector does not distinguish by company size.
Yes, that is what our Physical Pentest module is for. We simulate realistic access attempts, for example as a supposed driver or subcontractor, and check whether the gate, access controls and warehouse areas stand up to them.
That depends on the scope: the number of sites, whether TMS, WMS and terminal control should be included, and whether physical testing and social engineering are part of it. After the free initial consultation you receive a fixed-price quote.
In the free initial consultation we clarify your scope and where you stand on NIS2 and KRITIS. After that you receive a fixed-price quote, with no strings attached.
All about the industry: access-granted.de/en/branchen/logistics